Why GTD Power?
Our organization exists to continually manage your project’s planned work, and to deliver the objectives that your firm requires.
We strongly believe that all project’s costs overruns can be avoided by staying on schedule.
The key element for any project success is to have a comprehensive scope of work estimate, that encompasses the development and execution of a well-crafted management plan. The job’s deliverables are therefore completed, within the specified job’s quality standards and safety, guaranteeing the client’s satisfaction.
Our purpose is to use those estimates, and develop plans that deliver projects, on time and on budget, using our proprietary Elliptical Management Model – Em2 ©.
The ultimate goal of the firm is to do business with organizations that believe, like we do, that projects can be delivered, big or small, always on time and on budget.
These are the core reasons we are in the Project Management consulting business, and if you believe in great projects execution, then GTD Power is your choice.
How GTD Power delivers its services?
Working with our clients, we clearly define the scope of work, and progressively elaborate great estimate based schedules for the project’s work to be done.
We use this information to continually develop a Project Management Plan that includes: time, costs, scope, safety, environment, quality, change, engineering, construction, risks, resources, contracts, communication, documenting, control and compliance management planning using our proprietary Elliptical Management Model – Em2 ©.
Developed plan elements are carefully constructed, with its correspondent predecessor and successor activities, clearly identifying the project’s critical path, in order to stay on schedule.
Continually checking that planned milestones are being achieved, and test the validity of all made assumptions throughout the project’s life cycle, making adjustments to the execution plans as required.
When change occurs, we look to clearly define the problem, analyze all probable solutions and provide the client with options to decide best way to solve the hurdles every project experience.
You are certain that when trouble strikes, GTD Power consultants looks for the best possible costs and time solutions to be presented for your consideration, and decision making, always keeping the project going towards its defined target.
Elliptical Management Model Em2 ©
Our model consist on favouring better planning of the work, before execution begins, for all elliptic elements orbiting The Triple Constraint. You invest between 15% to 25% more in planning costs, and only start executing when the point of maximum preparation for the project is reached. By prioritizing preparation, our management model minimizes roll wave planning thus, maximizing best execution practice and results.

In managing projects, Cost – Time – Scope are the most referenced factors that the practitioner is told to focus on for successful integrations. There is more to orchestrating a great operation, than only considering these elements.
Planning Safety, Human Resources, Contracts Administration, Risks Register, Construction, Change Orders, Engineering, Environment, and Quality before starting the job, and for the duration of all works, are decisive in levelling the triple constrains.
Having executive Control, being Compliant, maintaining clear Communications, with required Documentation for the clients, the firm, regulators, and all other interested stakeholders’ hinges on that Preparation.
The Elliptical Management Model is based on these principles.

“Before beginning, plan carefully”
Marcus Tullius Cicero
105BC – 43BC
“Luck is what happens when Preparation meets Opportunity”
Seneca
54BC – 39AD
“By failing to prepare, you are preparing to fail“
Benjamin Franklin
1706 – 1790
Dampers replacement management support
There are many forces absorbed by power lines that might cause issues during its operation. From the lattice tower’s foundations, all the way up to the conductors, the most common force that transmission lines need to face throughout their operational lifetime, is Wind. Spacers installed on transmission power systems today normally serve under extreme weather conditions imposed by climate change. This increase the likelihood of experiencing fatigue due to severe wind conditions
This phenomenon exists in most areas of the world, where transmission lines are exposed to low amplitude vibration for long periods of time, most often when they are located over flat terrain and most evident on areas prone to ice formation over conductor. It also seems to be clear that this failure mode affects all types of dampening configurations, twin or quad spacers, that can become loose one way or the other due to a combination of vibration, conductor tension, defects during installation, ice formation and galloping.
Aeolian vibration can bring havoc to power systems, by loosening clamps and/or deterioration of elastomeric clamp coverings, leading to conductor damage, as experienced on several of Altalink’s transmission power Lines.
Therefore, and as part of SNC Lavalin’s Ad hoc committee member, we contributed with the development and implementation of a replacement program for Fargo dampers and Helix spacers for Altalink. A holistic approach was devised, implementing a four steps strategy to complete the hardware’s replacement:
- Documentary inventory and site inspection reporting.
- Conducted a root cause analysis for all failure mode types encountered & issue technical recommendations.
- Developed a new hardware specification, and QA/QC acceptance process.
- Implemented a field replacement program that included planning, execution, monitoring, communication and reporting to the client, following the recommendations from the failure analysis completed.

Managed the Engineering, Procurement and the Construction integration of transmission lines and substations for SNC Lavalin, including:
- New three (3) kilometer-138 kV single circuit, wood poles.
- New two x 138kV-2000A/69kV-1500A 25 MVA LTC transformers, one 138 kV dead tank circuit breaker and
- New AC/DC control building with constant telecom monitor and P&C systems.
Authorized budget at completion: $22.8M. Total 20 subcontractors and 38 purchase orders managed. Total change orders processed 15; Final EBIT 8.9%. Completed under budget and delivered on time. Project’s in-service date November 2014, closeout in December 2014. Overall total project man-hours completed 37,000.
Portfolio Management – TELECOM Projects
Owners Project Management Consulting for ALTALINK telecom projects, under Groundswell Project Services contract.
Altalink owns an operate the largest telecommunications network, with more than 600 telecom radio sites, controlling its more than 280 substations and 12,000 kilometers of transmission lines in Alberta.
It uses redundant systems to monitor and control all power being deliver in the province using MW and UHF radio signals, that are converted into fiber optic SCADA rings, in order to maintain dispatched load against power demand balanced at its control centers, avoiding unplanned outages.
As part of their operational repairs and upgrades, a portfolio of 45 projects were assigned to this contract for our augmented services, to be managed. The authorized budget to be executed totaled CAD$ 15.3 M. Jobs executed could be categorized into four major areas:
- Micro wave/UHF radio hops enhancements – 24%,
- New radio tower erections and salvage – 9%,
- SCADA over fiber optics communication rehabilitation – 15% and
- DC Plant systems upgrades – 52%.
33 jobs executed within budget and on scope without change orders, and within the Design Based Memorandum required timelines, in compliance with received Permit and License.

500 KVDC Bipole – III Transmission Line
Consulting Project Management Services for the construction of a 500KVDC transmission line sections C1 and C2 of the Bipole III for Rokstad Power Limited Partnership.
The in-scope work included 300 km of the preferred route, which is approximately 1,384 km total in length using: A three bundle 806-A4-61 AAAC high voltage conductor, one single OPGW type CC-13/51/486 fiber wire and 554 towers to be assembled and erected. The transmission line was broken in two segments: 294 towers for C1 and 260 towers for C2. The work to be completed was divided in two seasons: 160 towers during winter season 1 and 394 towers during winter season 2.
12 types of towers were engineered for the job, including: 6 guy wire tangents, 4 self standing (Out of which 2 were dead end types) and 2 anti cascading guy wired towers. Also 4 types of foundations were used in the project: Dead man anchor and concrete mats, overburden rock set, helical and micro piles.
The central portion of the project’s area, which corresponds to segments C1 and C2, is located between Renwer and Langruth, traversing a combination of private and crown owned lands. Primary land uses on this mixture of wooded and open lands include ranching, forage cropping and intensive agriculture. Indigenous engagement is key for the successful construction of the transmission line that crosses several traditional territories, reservations, game hunting areas and animal sanctuaries.
Total overall project cost estimate is CAD$4.6B. Project in-service projected schedule for 2018. Initial camps set up and mobilization started on November 2016.
Managed the Engineering, Procurement and the Construction integration of transmission lines and substations for SNC Lavalin, including:
- New 51km from Enmax 65 to Foothills 237s substations of double circuit 240kV circuit 240 kV-2×1033 kcmil ACSR Curlew line complete with 1xOPGW & 1xOHSW transmission line designated 1106L/1107L.
- New Foothills 237s substation to accommodate termination of a 240kV double circuit line (1106/1107) to the Foothills 237s.
- New temporary line of 2.5kM to hold single poles double circuit of 138kV 2×477 kcmil ACSR Hawk designated 850L
- New temporary line of 2.5kM to hold single poles double circuit of 240kV 2×1033.8 kcmil ACSR Curlew designated 1106/1107L
- Salvage of 3.5kM of existing line 138kV 2×477 kcmil ACSR Hawk double circuit designated 911L.
Authorized budget at completion: $181.9M. Total 25 subcontractors and 165 purchase orders managed. Total change orders processed 87; Final EBIT 6.7%. Completed under budget and delivered on time. Project’s in-service date June 2015, closeout in September 2016. Overall total project man-hours completed 121,000.
Managed the Engineering, Procurement and the Construction integration of transmission lines and substations for SNC Lavalin, including:
- New 240kV-5000A/138kV-2000A Windy flats substation 138S.
- New 240kV series capacitor station 266S.
- New 70 kM from Peigan 59S to Windy Flats 138S substations of double circuit 240 kV-2×477 kcmil ACSR Hawk line complete with 1xOPGW & 1xOHSW.
- New 120 kM from Foothills 237S to Windy Flats 138S substation of double circuit 240 kV-2×1033.8 kcmil ACSR Curlew line complete with 1xOPGW & 1xOHSW; Two in and out at the series capacitor 266S substation.
- New 70 kM from Windy Flats 138S to Lethbridge 370S substation of double circuit 240 kV-2×477 kcmil ACSR Hawk line complete with 1xOPGW & 1xOHSW.
Authorized Budget at completion $439.7M. Total 72 subcontractors and 359 Purchase Orders Managed. Total change orders processed 122; Final EBIT 5.5%. Project under budget, and delivered on time. Project’s in-service date October 2015, closed out in October 2016. Overall total project man-hours completed 289,000.
Managed the Engineering, Procurement and the Construction integration of 200 km Central and South lots towers between structures 340 to 956B for SNC Lavalin.
Implemented a testing program to support the change, from recommended concrete foundation to driven piles, for 213 lattice towers between segment from 517 to 730, saving $38.0M in it the project’s CAPEX budget. Saved 13 weeks of execution, doubling the rate of production for driven piles instead of concrete foundations.
Managed the Engineering, Procurement and the Construction integration of 150 km North lot towers between structures 1 to 339.
Completed successfully on time and budget, 6 programmed outages for lines 1201L-500KVAC 906L/910L/928L and 925L-240KVAC and 929L 240 kV. Completed 100% of required foundations – 70% weight earned value of the project’s rules of credit (all between structures 517 and 956), before summer breakup on schedule. Completed 100% Langdon re-termination 1201L-500KVAC and temporary Bennett 1113L adding 9 monopoles, 24 H-frame wood poles and three dead end lattice tower P51F 1201L/1113L. Completed 97.21% of the ROW site preparation, surveying, staking and geotechnical borehole investigations. Completed 49.9% of screw pile foundations.
Authorized budget $1.46B. Total 187 subcontractors and 640 purchase orders managed. Total change orders processed 1,150; Final EBIT 5.5%. Project on budget and delivered on time. Project’s in-service date October 2015, closed out in October2016. Overall total project man-hours completed 998,000.
11,380/600 VAC Power Generation, 35kVAC switchgear and control e-modular enclosures
ABB Canada – Skid Packaged 25/35kV Switchgear Substations.
FLUOR Canada/SUNCOR East Tank Farm – 35 kV. Total cost at completion CAD$ 2.8M.
WorleyParsons/Spectra Energy – Dawson Creek Processing Plant – 25kV. Total cost at completion CAD$ 1.1M.
AMEC – SUNCOR MLMR, load break switches – 25kV. Total cost at completion CAD$ 560K.
CUMMINS Power Generation – 600V/11.380V Power Gen Buildings
FLUOR Canada/ExxonMobil Kearl Silos U, A and R stand-by power. Total cost at completion CAD$ 5.5M
WorleyParson/CaltechSenex/Meg Energy – Cristina Lake campsite stand-by power. Total cost at completion CAD$ 1.2M
STANTEC/City of Saskatoon – H.Weir WWTP upgrade. Mission critical generators and automatic transfer switch stand-by power. Total cost at completion CAD$ 1.5M
IMV Projects/LARICINA energy SAGD Pilot Plant– NATGAS, prototype prime power. Total cost at completion CAD$ 4.0M.

Core Competencies
Customer Focus
- Keeping the customer up-to-date with information for decisions affecting their interests and impact on the job’s requirements.
- Monitoring trends, responding quickly and effectively to customer feedback.
- Maintaining positive relations with internal clients, functional teams and other stakeholders.
Drive Business/Project Execution
- Efficiently managing others to drive business results and performance.
- Undertaking reviews of business/project requirements and informing others of related updates or changes as required.
- Reviewing several alternative solutions for a situation, anticipating potential obstacles, and developing plans to overcome them.
- Managing time and resources effectively to accomplish required tasks either ahead of schedule or on-time.
- Taking and driving accountability for self and team.
Cost Management
- Exceeding the firm’s expectations by tightly controlling the budget for the assigned project tasks, minimizing margin erosion.
- Successfully negotiating cost saving solutions with the client and with the firm’s internal groups.
- Negotiating and agreeing with clients on the construction indirect costs, to maximize the firm’s reward.
Schedule Management
- Executing plans that include: time, costs, scope, safety, environment, quality, change, engineering, construction, risks, resources, contracts, communication, documents, control and compliance management planning.
- Monitoring and controlling plans, in order to keep projects on track, reviewing changes and mitigating them.
- Successfully managing all projects through their lifecycle stages, and bringing them to an orderly closeout conclusion, having completed all deliverables on time, on budget and as planned.
Health, Safety, Security & Environment
- Solid understanding and compliance with HSSE standards, principles and practices.
- Constantly sharing important HSSE information with the team.
- Promoting the development of HSSE skills and awareness, while managing reactions to situations, professionally and calmly.
Ethics & Compliance
- Solid understanding and compliance of ethical standards, by behaving in a manner consistent with the firm’s corporate Ethics & Compliance Program (ECP).
- Considering different ethical aspects of a situation, and taking a stand when making unpopular, but necessary decisions.
- Encouraging and actively driving dialogue, learning and commitment on controversial issues surrounding engineering, construction & procurement disciplines.
Base Knowledge
Developing Business by implementing Intrinsic Value Finance Modelling, making sure that the venture provides the firm with its thought after Return on Invested Capital, that is saddled with high levels of future free cash flow generation, contemplating the appropriate margin of safety for the discounted assumptions made.
The Leadership Team must then focus on how to implement its disruptive ideas and developed financial models, by creating opportunities in the marketplace, leveraging on their knowledge to innovate and add value to their clients.
Finally, and by being most adaptable to change, the firm can work their plans to grow wider moats for its products and services, with long runways to develop its base customers, and price power keeping the business always ahead of their competition.

A highly effective project team is defined, not just as talented people simply working together, but as a group of passionate professionals who trust in each other.
Elite military forces are highly efficient teams because they trust in each other with their lives in combat. They do this only because they believe, passionately, that their brothers in arms’ skills and tactics, will lead them to victory. High performance professional sports teams accomplish impossible feats by trusting in the sum of their collective skills to win a world class championship.
Showing passion for what you do, is the first step in making others believe in what you believe in, which is the way to build trust.
In all projects, regardless of size and complexity, change will be present.
Thus, the question execution teams, and the PM practitioners need to ask first is: Is it in the scope? Most teams add required changes to the system without considering the noted query. For the experienced project leaders, before any action is taken, the answer needs to be pondered first. Managing it will define if a project finishes on target. Not recognizing progressive elaboration impacts on the job requirements, often leads, to cost and time overruns.
Stakeholders, and most importantly, clients, benefit from effectively managing change by projects being delivered within scope, time and budget.
Knowing when to escalate an issue is more important than the problem itself.
Missing a deadline because of an uncompleted engineering, procurement, construction or management deliverable unresolved can be avoided if the problem is escalated at the right time. Often remind teams, during recurrent project review meetings that, if a problem can not be solved and they decide not to communicate it, they become the issue. That it is better to let go and allow others to provide the support required to meet the project’s due dates.
Recognizing this can prevent from falling behind schedule, and sometimes even, save thousands of dollars in extra costs for projects.
Quality is what the client requires.
Often times, the team wants to exceed by adding features to the originally designed systems, just because it can be done. The experienced practitioner managing the job understands, that, going down that path, may have overwhelming consequences. Falling short of the quality required by the client’s specs can pose a serious risk to the project, leading to huge financial overruns, contract mediation and legal proceedings. Fit for purpose add complexities requiring lots of subject matter expertise and extra efforts for the team to meet the required functionality.
It costs less to be within the specs, meeting the project’s scope and schedule.
Knowing exactly how your work, and that of others impacts the project, allows the team to maintain the Schedule.
When there are multiple subcontractors servicing a project, there is always confusion. The experienced practitioner knows, that clear communications is the only way to tackle this problem. Your first organization step is to get all subcontractors, with the prime and the client, at the same table on a recurrent basis. Second, is to develop look aheads, showing all contractors input to the work sequence and dependencies. And third, make sure that the prime/client’s required deliverables are finished on time, to support the planned work.
When all stakeholders are in alignment the schedule is maintained.
Politics are always a factor to manage in projects.
The practitioner needs to embrace it and keep on going forward. This is easier said than done. When more than one person work together there will be alliances, plots, reverse aggression or worse, downright lying. It is as real as the light of day, and can reign havoc on the work planned. The only way to embrace it, is to avoid it from affecting you personally. Accept it, the Project Managers are moving targets. This practice is the art of surfing calm waters. Moving forward everyday is a sign that, despite politics, you are doing what is right.
If you are not moving ahead, then you are falling behind.
When crisis strikes your project, remain calm, clearly communicate your plans and lead towards a solution.
First, breakdown your problem into the smallest pieces possible, evaluate solutions and plan actions for the team to overcome the issues. Second, communicate the facts as they are to all stakeholders. Third, monitor the team’s actions results, making required adjustments to get the project back on track. The practitioner’s priority is to demonstrate you are leading, irrespective of the situation, and keep clear and calm communications flowing. If setback happens, start over and keep pushing.
Remember, whatever you do, never communicate a problem without proposing the team’s plans to solve it.
Having the required time to plan your work can help deliver projects on schedule.
In average, planning your engineering, procurement and construction management work weighs around 10% to 15% of the project’s total costs. On the other hand, the integration portion of the job takes 60% to 65% of the same totals. The difference between these two, being procurement for long and short lead items required for the completion of the job, ranges between 20% to 30%. Therefore, if issues arise during the job’s integration they will have the biggest impact on the project’s cost overruns.
Thus, it is most cost effective to plan the work as thoroughly as possible, to maintain projects on schedule.
Risk evaluation, control and aversion will help complete projects promptly.
Your risk register is the best tool in your management’s box to quantify time and cost impact to the project when the unexpected happens. When planning a job, there are a number of assumptions made to make jobs feasible. There will always be threats that, if considered, will deter a job from taking off. Thoroughly qualifying and quantifying costs and time impact to accept, mitigate or transfer risks, makes prudent management possible. Thus, a contingency, for both prime and owner, can be exercised promptly and decisively.
Use your registry when the unexpected threatens your in scope, and efficiently avoid risks.
The best planned jobs results in the best executed projects.
Irrespective of size, total budget value or industry, the best executed projects, defined as the ones that finished on schedule and under budget, start with highly accurate work plan estimates. After being exposed to the great, the bad and the ugly, including runaway projects, ranging from thousands to multi million dollars, the best ones always begin and end with well developed work plans. Estimation is an art that requires the practitioner to undergo a process of trial and error, and consider many other business strategies, for projects to pass through executives’ go ahead.
As the old adage goes: “Victory favors planning”.
Misinformation will outweigh your best Project Management practice.
If you find yourself in this predicament, the job will be defined by that one moment when unconfirmed data was used to make decisions. You can go through many ups and downs with the project, but the practitioner knows that it is better to be transparent. Always make sure your “i’s” are dotted and your “t’s” are crossed, and do not ever make assumptions. “Trust but verify”, Reagan kept on telling Gorvachev, before the height of the “Tear Down this Wall” moment.
False or misleading information used to make decisions will outlive your project’s performance.
The Project Manager needs to always be ethically compliant and avoid the “Normalization of the Deviation”.
Astronaut Mike Mullane coined this concept, by initially trying to explain the root causes for The Challenger fatal disaster and, most recently, The Columbia spacecraft explosions, that occurred in 1986 and 2003. His conceptualization of what lead to these catastrophic events concluded that, under projects’ stress, humans tend to take short cuts, in order to meet a necessary job condition, by sacrificing testing or cutting quality corners to stay on time and budget.
All team members are required to be “Self Courageous Leaders”, and contribute, to the project’s work safety and compliance.
WILD GUEVARA, P.Eng
Registered Professional Engineer in the province of Alberta with APEGA since 2008.
Managing Executive with over 30 years of experience, delivering turn key projects as well as capital allocation into equity markets. Responsible for projects ranging from several hundred thousands, to multi-million dollars. Accountable to the The firm’s bottom line in capital allocations and, for delivering projects on schedule, within the required scope and under budget for clients in the power industry, during my tenure positions.
Married with two kids, loves baseball and the Toronto Blue Jays. Started playing drums at a very young age, and I continue to enjoy, and practice the instrument today. Loves spending time with family and friends, over a nicely cooked roast beef. If you wonder how I got my name, true story is, it originates from The Wild, Wild West TV Series. This is a very good family story, I love to tell people when they ask me.